High-speed railway line from Beijing to Shanghai, Nanjing Big Bridge, Supervision
Client | MOR Ministry of Railway, China / CARS, China Academy of Railway Science, China |
Total length | 1.615m total, spans up to 336 m |
Services | Supervision – Construction management |
Supervision for work preparations, steel constructions at the plant and their execution; training of site supervision for engineering structures and superstructure as well as production of steel system elements. Control of supervision of assembly on site.